The cheapest lesson in construction is a properly prepared BOQ. Here is what it protects you from.
Most cost overruns on private projects in Nigeria are not caused by inflation. They are caused by a project starting without an agreed measure of what is being built.
A bill of quantities turns a drawing into measured items — concrete by cubic metre, blockwork by square metre, reinforcement by tonne. Once each item has a rate, a variation becomes a calculation instead of an argument.
It also lets you compare contractors honestly. Three quotes against the same BOQ are comparable; three lump sums are not.